When Do eAuctions Work? 7 real use cases Download eGuide
Updates | August over a field of sunflowers

New Release – August 2020

As the summer draws to an end, we are looking back at what has been a challenging financial year for everyone; both at Market Dojo and for our users. We have all had to adapt to a new way of working and keeping in touch with one another. Hopefully in this time we’ve been able to make things simpler for procurement teams using our systems, providing a way to work remotely with ease. 

We’re proud to have been consistently delivering enhancements directly requested by our user base and we will continue to do so as we go into the 2021 financial year.

Allow Bids Against RFQ Direction

When creating a new bidding round users will have the option to allow bids to go in the opposite direction to the RFQ. For a reverse auction, a checkbox will be shown to ‘allow bids to increase’, if selected, participants will be able to bid higher than they did in the previous round of bidding.

This will allow for more flexibility in the bidding process, as specifications are clarified between rounds.

An RFQ round form with participants selected and ‘Allow bids to increase?’ checked as saving begins.

Specificity in SIM Document Status

In order to highlight the differences between participants responding to SIM questionnaires, we have split out the Document Statuses to provide more granular information.

In instances where a participant has been sent a questionnaire containing document questions, but they are yet to respond, the Document Status shown against them will be ‘Not Submitted’. If a new document is requested of a supplier, their Document Status will also revert to ‘Not Submitted’ until they have completed the questionnaire.

For cases where no documents are requested of a participant, their Document Status will now show as ‘N/A’ as the field is not relevant.

Table of pending acceptance items in progress, with N/A or Not Submitted document statuses and a filter showing 2 selected.

Displaying Contract Dojo Custom Fields

To ensure that the Contract Dojo list page only contains the most pertinent information, we have added the ability for users to select the custom fields that should be displayed.

From the Contract Settings page, the custom fields grid now contains an extra column for ‘Show in Summary’, which will be set to false by default. When set to true, a column will be added to the right of the summary grid showing that field and its values.

Custom fields table: numeric, checkbox and list fields are active and optional; only the checkbox field shows in summary.

Editing Contract Dojo Notes

Ensuring that changes can be made to all elements of records within Contract Dojo, we have added the ability to update notes. Against each entry, a new icon will show on the right for editing, which on click will open the text window and allow amendments. 

Once a note has been edited, for auditing purposes this will be highlighted within the grid display with an ‘(edited)’ label above the note. An entry will also be made within the Contract history to show the changes that have taken place.

A note is edited and saved, then appears in the Notes list marked as edited.

Change log table: contract note 1073 body updated by ndhost1@marketdojo.com; values and date are truncated.

Other Changes

Our development team have also been able to release a series of smaller enhancements across our modules:

  • SIM Contact Lists limited to a single lead participant
  • Improvements to the Simple Lot download
  • Invitations to SIM to show from the user designated within the SIM Settings
  • We have improved our notes creator to include document linking

In the Works

In the next month we have many more changes lined up for our products, here are just a few of them:

  • Allowing Contracts to be assigned to two categories
  • Dropped participants’ bids to be shown within Multi-Stage RFQ events
  • Dropped participants to be available to re-addition within Multi-Stage RFQ events
  • ‘On Hold’ to always be available as an option for a participant in SIM
  • Improvements to sealed bid events
September 7, 2020
Get A Demo Today